Official Statements
MOLEC Official Statements
20 March, 2012
During March 2012, Molec Electrical Contractors were involved in the electrical upgrade to the Silo Electrical Services to comply with current standards for Goodman Fielder - Pampas.
The requirement of this project was to inspect the existing installation and formulate a turnkey solution to upgrade the designated plant to comply with current legislation while the facility remained in full production and preserving the protocols required to operate in a food preparation environment.
This installation works consisted with mainly all Steel Wire Armour and Intrinsically Safe cables for use in Hazardous Dust environments classified as Zone21 and Zone22 and integrating 24Vdc equipment with an existing PLC which operated on a 240Vac system.
Works also included the installation of pneumatic actuators in the classified hazardous areas in lieu of non-compliant electrically operated actuators and valves.
Part of these works included developing a plan to facilitate working at heights over shared trafficable areas requiring the passage of delivery vehicles in order to keep the plant in full production.
23 February 2009
Oaky Creek Coal Seam Methane Power Station 6MW Expansion Oaky Creek North, QLD
Molec performed the following work on this project on behalf of Clarke Energy Australia
18 December 2008
Australian Federal Police - Weston Data Centre Canberra - Emergency Generator Installation
Molec performed the following work on this project on behalf of Coote Energy:
30 November 2008
Installation of Four 308 KVA Cogeneration plants for Sydney Water at Glenfield, Liverpool, Warriewood and Wollongong
Our hazardous area electrical contractors performed the following work on this project on behalf of Clarke Energy Australia
30 August 2008
Braemer Power Station - TwoSea Containerised 635kVA Emergency Diesel Generator Sets
Molec performed the following work on this project for Coote Energy:
23 June 2008
EDL 45MW turnkey Coal Seam Methane Power Station Moranbah North QLD
Molec performed the following work on this project on behalf of Clarke Energy Australia